It took a day or two to set up the forms, but only 45 minutes to an hour to fill them with concrete. After a day the forms are striped of and the walls revealed. Then a layer of plastic, insulation, wire mesh, and the tubing for the heat was prepared, before they poured the slab. We also waterproofed the outside walls with a blue liquid rubber and two inch's of foam insulation, from the footings up to the top of the wall.
Friday, July 17, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment